Motorola PTP 500 User's Guide Page 75

  • Download
  • Add to my manuals
  • Print
  • Page
    / 447
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 74
PTP 300 and PTP 500 Series User Guide Ethernet bridging
phn-1115_006v000
Sep 2010
1-35
In-band management
In the in-band management mode, the management agent can be reached from the
Ethernet port at the local ODU, and (assuming that the wireless link is established) the
Ethernet port at the remote ODU.
Management frames in the customer network are processed by the management agent
if (a) destination MAC address in the frame matches the CMU MAC address, and (b)
the VLAN ID in the frame matches the VLAN configuration of the management agent.
If Local Packet Filtering is enabled, unicast frames forwarded to the management
agent are filtered, that is, not forwarded in the customer network.
In-band quality of service
Frames generated within the management agent may be assigned a configured
Ethernet priority. Management frames are multiplexed with customer frames of the
same priority for transmission at the wireless port.
Source address learning
If Local Packet Filtering is enabled, the system learns the location of end stations from
the source addresses in received management frames. The agent filters transmitted
management frames to ensure that the frame is transmitted at the Ethernet port, or
over the wireless link as appropriate. If the end station address is unknown, then
management traffic is transmitted at the Ethernet port and over the wireless link.
Wireless link down alert
The PTP 300 and PTP 500 Series provide an optional indication of failure of the
wireless link by means of a brief disconnection of the data port. The Wireless link
down alert can be used to trigger protection switching by Spanning Tree Protocol
(STP) or Ethernet Automatic Protection Switching (EAPS) in a redundant network.
Back-to-back links
PTP 300 and PTP 500 will not operate correctly if a direct cabled connection is made
between two PIDUs. Where two or more links are deployed in a chain, always use an
Ethernet switch or router to interconnect the links at the relay points.
Page view 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 ... 446 447

Comments to this Manuals

No comments