Chapter 8
phn-1115_006v000
Sep 2010
8-1
Chapter 8 Troubleshooting
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
.
.
.
This section contains procedures for identifying and correcting faults in a PTP 300 or
PTP 500 link. These procedures can be performed either on a newly installed link, or
on an operational link if communication is lost.
Select appropriate test procedures from the following list:
• Testing link end hardware on
page 8-2.
• Testing the radio link on pa
ge 8-14.
• Testing after a lightning strike on pa
ge 8-16.
• Testing PTP-SYNC on p
age 8-17.
• Testing a telecoms link on page 8-19.
Comments to this Manuals