Installing the drop cable and LPU Chapter 5 Installation
phn-1115_006v000
5-24
Sep 2010
Installing and connecting the LPU
Perform this procedure to install and ground the LPU and connect it to the drop cables
at the building (or cabinet) entry point (Figure 5-10).
Figure 5-
10 Grounding at building entry
Comments to this Manuals