Motorola PTP 500 User Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
10
Mast, Tower or Building Installation
Hoist and Safety Loop
Use the integral safety loop for hoisting the ODU up a mast, tower or building. When the ODU is in
position, use the safety loop as a fixing point to secure a permanent lanyard from the mast, tower
or building to the ODU, as a precaution against mounting failure.
WARNING: The safety lanyard must not exceed 1m (approx 3 ft) in length. The lanyard
must be made from a material that does not degrade in an outdoor environment.
WARNING: The safety lanyard must be fixed to a separate fixing point that is not part of the
direct mounting system for the ODU.
WARNING: If the safety loop or its fixing is damaged in any way or has been exposed to a
shock loading due to a fall, replace it with a new one before undertaking any further
operations.
More information:
PTP 300 Series User Guide
or PTP 500 Series User Guide
Section: “Mounting the ODUs”
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 25 26

Comments to this Manuals

No comments