Motorola AP-6511 User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 6
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
WLAN Installation – Bring out the hammer drill
TRADITIONAL THINKING
Plan one to three hours per AP for the physical installation,
depending on the ceiling access and cable routing.
Each hotel can require a different installation. Some hotels use
concrete construction, making installation in the hallway an arduous
task with ladders and hammer drills. The installation problems are
closely associated with the site survey already discussed. During the
site survey, it is equally important to pay attention to how the cables
will be run.
Consistency is the key to lowering installation cost. Service providers
will train their installation teams to follow a set routine and replicate
the procedure at every site.
The AP 6511 installation is simple:
1. Remove the existing structured wiring plate
2. Install the Universal Bracket
3. Connect the pigtail RJ45 cable from the access point to the
structured cabling
4. “Hook and Snap” the access point to the bracket
4 The AP 6511 802.11n Wall Plate Access Point
NEW THINKING
Repeatable, consistent installation routine
Page view 3
1 2 3 4 5 6

Comments to this Manuals

No comments