ATN/IPS WG/4-REPORT INTERNATIONAL CIVIL AVIATION ORGANIZATION REPORT OF THE FOURTH MEETING OF THE AERONAUTICAL
ATN/IPS WG/4-REPORT APPENDIX 2A 2A-3 CONCLUSIONS AND DECISIONS FOLLOW-UP TO BE INITIATED BY DELIVERABLE TARGET DATE REMARKS CONCLUSION 13/30: N
- 3 - 15. Any Participating State may withdraw from this Memorandum of Agreement by giving a prior written notice of six (6) months to the MID
---------------
ATN/IPS WG/4-REPORT APPENDIX 4B ATN/IPS WG/4 Appendix 4B to the Report on Agenda Item 4 MID-AMC Board TOR 1. Terms of Reference (TOR) 1.1 The Ter
ATN/IPS WG/4-REPORT 5-1 ATN/IPS WG/4 Report on Agenda Item 5 REPORT ON AGENDA ITEM 5: FUTURE WORK PROGRAMME 5.1 The meeting noted that MIDANP
ATN/IPS WG/4-REPORT APPENDIX 5A ATN/IPS WG/4 Appendix 5A to the Report on Agenda Item 5 TASK LIST No Description Deliverables Target date Responsibil
ATN/IPS WG/4-REPORT 6-1 ATN/IPS WG/4 Report on Agenda Item 6 REPORT ON AGENDA ITEM 6: ANY OTHER BUSINESS 6.1 Nothing has been discussed under t
ATTACHMENT A ATN/IPS WG/4 Attachm
A-2 NAME TITLE & ADDRESS Mr. Khaled Mohamed Reda Ahmed Communication Engineer Ministry of Civil Aviation Cairo Airport Road Cairo - EGYPT Fax:
A-3 NAME TITLE & ADDRESS ISLAMIC REPUBLIC OF IRAN Mr. Bahman Bagheri Deputy of Communication and Navigation in Administrative Iranian Airport
A-4 NAME TITLE & ADDRESS SAUDI ARABIA Mr. Abdullah A. Binsaleh Computer Networking Engineer General Authority of Civil Aviation Air Navigation
ATN/IPS WG/4-REPORT APPENDIX 2A 2A-4 CONCLUSIONS AND DECISIONS FOLLOW-UP TO BE INITIATED BY DELIVERABLE TARGET DATE REMARKS CONCLUSION 13/63: ELI
ATN-IPS WG/4-REPORT 3-1 ATN-IPS WG/4 Report on Agenda Item 3 REPORT ON AGENDA ITEM 3: REVIEW AND UPDATE OF MID ATN PLANS AND IMPLEMENTATION ISSU
ATN-IPS WG/4-REPORT 3-2 ATN-IPS WG/4 Report on Agenda Item 3 3.7 The meeting was of the view that the complete SWIM concept is huge and beyond the
ATN-IPS WG/4-REPORT 3-3 ATN-IPS WG/4 Report on Agenda Item 3 3.12 The meeting noted that Asymmetric routing may cause loss of messages due to the f
ATN-IPS WG/4-REPORT 3-4 ATN-IPS WG/4 Report on Agenda Item 3 3.20 The meeting was informed that the establishment of data links between Tehran, Abu
ATN/IPS WG/4-REPORT APPENDIX 3A ATN/IPS WG/4 Appendix 3A to the Report on Agenda Item 3 State State Bahrain (Manama) Speed ISP IP Address Net M
Figure 1: Bahrain Circuit Diagram
State Egypt (Cairo) State Speed ISP IP Address Net Mask Router Type Data end user interface Applications in use Amman 64k Telecom Egypt (ATM)
Figure 2: Cairo Circuit Diagram
The designations employed and the presentation of material in this publication do not imply the expression of any opinion whatsoever on th
State State Saudi Arabia (Jeddah) Speed ISP IP Address Net Mask Router Type Data end user interface Applications in use Cairo 128k N/A 192.
State IRAN(Tehran) State Speed ISP IP Address Net Mask Router Type Data end user interface Applications in use Manama 64k Iran PPT 172.1
Figure 4: Tehran Circuit diagram
State State UAE (Abu Dhabi) Speed ISP IP Address Net Mask Router Type Data end user interface Applications in use Bahrain1 64K Etisalat N/A N/A
State State Kuwait(Kuwait) Speed ISP IP Address Net Mask Router Type Data end user interface Applications in use Beirut 64K N/A -- -- Motorola Mod
State State Jordan (Amman) Speed ISP IP Address Net Mask Router Type Data end user interface Applications in use Cairo 64k N/A 10.10.10.1 2
State Iraq State Speed IP Address Net Mask Router Type IP.V Iraq did not submit -IP network Survey State K
State Syria State Speed IP Address Net Mask Router Type IP.V Syria did not submit -IP network Survey State
in the MID RegionVersion 6 - May 2012Routing Directory forAFTN and CIDIN CentresINTERNATIONAL CIVIL AVIATION ORGANIZATIONMIDDLE EAST OFFICE ATN-IPS W
MID AFTN/CIDIN Routing DirectoryTable of COM Centres (listed in alphabetical order by COM Centre location indicator)Location IndicatorLocated State Ta
TABLE OF CONTENTS Page PART I - HISTORY OF THE MEETING 1. Place and Duration ...
MID AFTN/CIDIN Routing Directory Explanation(1)1. Explanation of the Tables(Remark: All tables show examples and do not reflect the real situation)1.1
MID AFTN/CIDIN Routing Directory Explanation(2)1.4.Virtual Circuit Groups (VCG)Actual VCGActual Prim.VCActual SecondaryVC’sPlanned VCGPlanned Prim.VCP
MID AFTN/CIDIN Routing Directory OBBI-IOBBI - Bahrain - BahrainInformationOperator: Technical operator:Phone: +973 17321185 Phone: +973 17329004 - - +
MID AFTN/CIDIN Routing Directory OBBI-AOBBI - Bahrain - BahrainAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Pla
MID AFTN/CIDIN Routing Directory OBBI-RVOBBI - Bahrain - BahrainCIDIN Routing TableCIDIN Actual Actual Planned Planned CIDIN Actual Actual Planned Pla
MID AFTN/CIDIN Routing Directory OBBI-COBBI - Bahrain - BahrainCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity
MID AFTN/CIDIN Routing Directory HECA-IHECA - Cairo - EgyptInformationOperator: Technical operator:Phone:202 22678999Phone: 202 2657829 - -202 2265788
MID AFTN/CIDIN Routing Directory HECA-AHECA - Cairo - EgyptAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Planned
MID AFTN/CIDIN Routing Directory HECA-RVHECA - Cairo - EgyptCIDIN Routing TableCIDIN Actual Actual Planned Planned CIDIN Actual Actual Planned Planned
MID AFTN/CIDIN Routing Directory HECA-CHECA - Cairo - EgyptCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity (bp
ATN/IPS WG/4-REPORT -1- ATN/IPS WG/4 History of the Meeting PART I – HISTORY OF THE MEETING 1. PLACE AND DURATION 1.1 The Fourth Meeting of Aeron
MID AFTN/CIDIN Routing Directory OIII-IOIII - Tehran - IranInformationOperator: Technical operator:Phone: 0098 21-61022330 Phone: 0098 21-61022330 - -
MID AFTN/CIDIN Routing Directory OIII-AOIII - Tehran - IranAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Planned
MID AFTN/CIDIN Routing Directory OIII-COIII - Tehran - IranCircuit CharacteristicsSituation recorded in May 2012 PlannedLink Protocol Capacity (bps) P
MID AFTN/CIDIN Routing Directory ORBI-IORBI - Bagdad - IraqInformationOperator: Ali Hussain Naser Technical operator: Basema JaleelPhone: + 964 79013
MID AFTN/CIDIN Routing Directory ORBI-AORBI - Bagdad - IraqAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Planned
MID AFTN/CIDIN Routing Directory ORBI-CORBI - Bagdad - IraqCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity (bp
MID AFTN/CIDIN Routing Directory OJAM-IOJAM - Amman - JordanInformationOperator:Mona al - NadafTechnical operatoTargrred GhaziPhone: +9626 4891401/3
MID AFTN/CIDIN Routing Directory OJAM-AOJAM - Amman - JordanAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Planne
MID AFTN/CIDIN Routing Directory OJAM-COJAM - Amman - JordanCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity (b
MID AFTN/CIDIN Routing Directory OKBK-IOKBK - Kuwait - KuwaitInformationOperator: Technical operator:Phone: + (965) 24711054 Phone: + (965) 24721297 -
ATN/IPS WG/4-REPORT -2- ATN/IPS WG/4 History of the Meeting Agenda Item 3: Review update of MID ATN plans and implementation issues Agenda Item 4
MID AFTN/CIDIN Routing Directory OKBK-AOKBK - Kuwait - KuwaitAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Plann
MID AFTN/CIDIN Routing Directory OKBK-COKBK - Kuwait - KuwaitCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity (
MID AFTN/CIDIN Routing Directory OLBA-IOLBA - Beirut - LebanonInformationOperator: Technical operator:Phone: + 961 1 628161 Phone: - - - -Fax: +961 1
MID AFTN/CIDIN Routing Directory OLBA-AOLBA - Beirut - LebanonAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Plan
MID AFTN/CIDIN Routing Directory OLBA-COLBA - Beirut - LebanonCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity
MID AFTN/CIDIN Routing Directory OLBA-RVOLBA - Beirut - LebanonCIDIN Routing TableCIDIN Actual Actual Planned Planned CIDIN Actual Actual Planned Plan
MID AFTN/CIDIN Routing Directory OOMS-IOOMS - Muscat - OmanInformationOperator: Mushal Abdul AzizTechnical operato Abdullah Salim Al-ShuailiPhone:
MID AFTN/CIDIN Routing Directory OOMS-AOOMS - Muscat - OmanAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Planned
MID AFTN/CIDIN Routing Directory OOMS-COOMS - Muscat - OmanCircuit CharacteristicsSituation recorded in May 2010 PlannedLink Protocol Capacity (bps) P
MID AFTN/CIDIN Routing Directory OPKC-IOPKC - Karachi - PakistanInformationOperator: Technical operator:Phone: 92-21-45791943 Phone: 92-21-45791944 -
ATN/IPS WG/4-REPORT 1-1 ATN/IPS WG/4 Report on Agenda Item 1 PART II: REPORT ON AGENDA ITEMS REPORT ON AGENDA ITEM 1: ADOPTION OF THE PROVISIO
MID AFTN/CIDIN Routing Directory OPKC-AOPKC - Karachi - PakistanAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Pl
MID AFTN/CIDIN Routing Directory OPKC-COPKC - Karachi - PakistanCircuit CharacteristicsSituation recorded in October 2004 PlannedLink Protocol Capacit
MID AFTN/CIDIN Routing Directory OTBD-IOTBD - Doha - QatarInformationOperator: Technical operator:Phone: 00974 4656220/268 Phone: - - 00974 4622510 -
MID AFTN/CIDIN Routing Directory OTBD-AOTBD - Doha - QatarAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Plannedn
MID AFTN/CIDIN Routing Directory OTBD-COTBD - Doha - QatarCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity (bps
MID AFTN/CIDIN Routing Directory OEJD-IOEJD - Jeddah - Saudi ArabiaInformationOperator: Technical operator:Phone: +966 2 685 0532 Phone: +966 2 685 50
MID AFTN/CIDIN Routing Directory OEJD-AOEJD - Jeddah - Saudi ArabiaAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned
MID AFTN/CIDIN Routing Directory OEJD-COEJD - Jeddah - Saudi ArabiaCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capa
MID AFTN/CIDIN Routing Directory OEJD-RVOEJDCIDIN Routing TableCIDIN Actual Actual Planned Planned CIDIN Actual Actual Planned PlannedExit Main Altn.
MID AFTN/CIDIN Routing Directory OSDI-IOSDI - Damascus - SyriaInformationOperator: Technical operator:Phone: 011-5400985-9/4165 Phone: 011-5400985-9/4
ATN/IPS WG/4-REPORT 2-1 ATN/IPS WG/4 Report on Agenda Item 2 REPORT ON AGENDA ITEM 2: FOLLOW-UP ON MIDANPIRG/13 AND OTHER MEETINGS CONCLUSIONS AN
MID AFTN/CIDIN Routing Directory OSDI-AOSDI - Damascus - SyriaAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Plan
MID AFTN/CIDIN Routing Directory OSDI-COSDI - Damascus - SyriaCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity
MID AFTN/CIDIN Routing Directory OMAE-IOMAE - Abu Dhabi - U.A.E.InformationOperator: Technical operator:Phone: 00971 2 599 6851 Phone: 00971 2 599 686
MID AFTN/CIDIN Routing Directory OMAE-AOMAE - Abu Dhabi - U.A.E.AFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Pl
MID AFTN/CIDIN Routing Directory Version 0.2 draft OMAE-COMAE - Abu Dhabi - U.A.E.Circuit CharacteristicsSituation recorded in October 2011 PlannedLin
MID AFTN/CIDIN Routing Directory OYSN-IOYSN - Sanaa - YemenInformationOperator: Technical operator:Phone: 00967-1-345289-326 Phone: - - - -Fax: 00967
MID AFTN/CIDIN Routing Directory OYSN-AOYSN - Sanaa - YemenAFTN Routing TableDesti- Actual Actual Planned Planned Desti- Actual Actual Planned Planned
MID AFTN/CIDIN Routing Directory OYSN-COYSN - Sanaa - YemenCircuit CharacteristicsSituation recorded in October 2011 PlannedLink Protocol Capacity (bp
MID FASID – CNS1 APPENDIX C 4-CNS 1-1 Table CNS 1A – AFTN Plan State/Station Cat Current Planned Target dat
4-CNS 1-2 MID FASID – CNS1 State/Station Cat Current Planned Target date of implementation Remarks Type Signa
ATN/IPS WG/4-REPORT APPENDIX 2A ATN/IPS WG/4 Appendix 2A to the Report on Agenda Item 2 FOLLOW-UP ACTION PLAN ON MIDANPIRG/13 CONCLUSIONS AND DECISIO
MID FASID – CNS1 4-CNS 1-3 State/Station Cat Current Planned Target date of implementation Remarks Type Si
4-CNS 1-4 MID FASID – CNS1 State/Station Cat Current Planned Target date of implementation Remarks Type Signa
MID FASID – CNS1 4-CNS 1-5 State/Station Cat Current Planned Target date of implementation Remarks Type Si
4-CNS 1-6 MID FASID – CNS1 State/Station Cat Current Planned Target date of implementation Remarks Type Signa
MID FASID – CNS 1B - TABLE CNS 1B MID Aeronautical Message Handling System (AHMS) Implementation Plan EXPLANATION OF THE TABLE Column 1 N
State Installation Operation MTA Name AFTN/AMHS Gateway ATS Message UA ATS service level Protocol (IPS, ATN) Remarks 1 2 3 4 5 6 7 8 9 Bahrain -
State AMHS Address Specification State Name Nationality Letters or Designator Country-name attribute ADMD-name attribute PRMD-name attribute A
MID FASID – CNS 1C 4-CNS 1C-1 TABLE CNS 1C - AERONAUTICAL TELECOMMUNICATION NETWORK EXPLANATION OF THE TABLE Column : 1 Name of t
STATE/CENTERS ATN APPLICATI ONS ATN ROUTER TYPE ATN RD ADDRESS PREFIX AFTN/AM HS GATEWAY CONNECTED WITH ROUTER OF VIA IMPLEMENTA TION DATE REMARKS
STATE/CENTERS ATN APPLICATI ONS ATN ROUTER TYPE ATN RD ADDRESS PREFIX AFTN/AM HS GATEWAY CONNECTED WITH ROUTER OF VIA IMPLEMENTA TION DATE REMARKS 1
ATN/IPS WG/4-REPORT APPENDIX 2A 2A-2 CONCLUSIONS AND DECISIONS FOLLOW-UP TO BE INITIATED BY DELIVERABLE TARGET DATE REMARKS CONCLUSION 13/26: MI
ATN/IPS WG/4-REPORT APPENDIX 3D ATN/IPS WG/4 Appendix 3D to the Report on Agenda Item 3 ATS INTER-FACILITY DATA COMMUNICATION (AIDC) IMPLEMENTATION
State/Administration Location of AIDC end system AIDC Pair AIDC standard used Target date of Implementation Remarks Correspondent location Correspo
State/Administration Location of AIDC end system AIDC Pair AIDC standard used Target date of Implementation Remarks Correspondent location Correspo
ATN-IPS WG/4-REPORT 4-1 ATN-IPS WG/4 Report on Agenda Item 4 REPORT ON AGENDA ITEM 4: FOLLOW UP THE PROGRESS OF MID REGION ATS MESSAGE MANAGEMENT
ATN-IPS WG/4-REPORT 4-2 ATN-IPS WG/4 Report on Agenda Item 4 4.8 Based on above, the meeting reviewed and updated the legal model to be signed by
ATN/IPS WG/4-REPORT APPENDIX 4A ATN/IPS WG/4 Appendix 4A to the Report on Agenda Item 4 Middle East Regional ATS Messaging Management Cent
MEMORANDUM OF AGREEMENT On the establishment, operation and management of the Middle East Regional ATS Messaging Management Center (MID AMC) fully
MID AMC MOA dated May 2012
-2- Propose optimum routing based one regional change Create access accounts and authorization according to regional procedure Create necessary
MID AMC MOA dated May 2012
Comments to this Manuals